About the Landscape Juice Network

Founded in 2008. The Landscape Juice Network (LJN) is the largest and fastest growing professional landscaping and horticultural association in the United Kingdom.

LJN's professional business forum is unrivalled and open to anyone within within the UK landscape industry

LJN's Business Objectives Group (BOG) is for any Pro serious about building their business.

For the researching visitor there's a wealth of landscaping ideas, garden design ideas, lawn advice tips and advice about garden maintenance.

Stepping stones through pond

Hi all.

I am building a pond with stepping stones through the middle. I will build block piers and cover them with epdm liner. The natural stone stepping stones will be laid on top of the liner.

My question is will the mortar bond sufficiently to the epdm or will I have to paint some other bonding product to help it adhere? I dont want it to come away after a few years.

Many thanks

You need to be a member of Landscape Juice Network to add comments!

Join Landscape Juice Network

Votes: 0
Email me when people reply –

Replies

  • PRO

    It will not bond to the liner, it will stay put but if they are going to be walked on there is a chance they will move, you could try some of the fix all type sealants.

  • PRO

    We install many of these. The best method is to laminate the entire pond with in-situ fibreglass over the concrete base and block supports. The beauty of fibreglass is there are no joints or folds and is a perfect seal. Not to mention bringing pipes and cables through the base rather than tucking under the coping. 

    Make sure the gel coat doesn't cover the entire top of the blocks you want to bed on to and then lay the stepping stones on a mortar bed with SBR additive. 

    Tim

    • Thanks for the replies. I'll go for the fibreglass option. Is the best way to get a pond liner kit?

       

This reply was deleted.

Trade green waste centres

<!-- Google tag (gtag.js) --> <script async src="https://www.googletagmanager.com/gtag/js?id=G-WQ68WVXQ8K"></script> <script> window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'G-WQ68WVXQ8K'); </script>

LJN Sponsor

Advertising

PRO Supplier

A team from Howardson Group is preparing to take on the formidable National Three Peaks Challenge in memory of their much-missed colleague, Joe Emery, who sadly passed away in July last year. The challenge will see the team scaling the highest…

Read more…