Setting out a large landscaping project

How did a small landscaping contractor from Southampton secure a huge contract (their largest contract to date) out of area and manage it you ask? Let’s start at the beginning…

Bath Rugby Club wanted some landscaping works completed at their training ground, Farleigh House. They approached Marshalls, as the leading product manufacturer in the UK who put forward three of their best award winning domestic contractors who were a part of their register.

The brief was to create a large car parking area, lay paths and create a paved awards atrium with steps (lots of them) for the rugby clubs training facilities situated at Farleigh House.

The products they chose to complete the project was Marshalls Antique Silver Sawn Sandstone plus step kits, Scoutmoor Setts for the paved areas and Tegula Drivesett Traditional kerbs.

It was imperative that the project met the highest standards of workmanship with a fantastic finish as the training facilities are accessed by the media to film live coverage and reports so it was the first impression given to fans and followers of Bath Rugby Club (no pressure!!)

The client’s main concern was attention to detail so although the contract was technically a commercial project they requested a high quality domestic installer and hence the project was secured.

The project was the largest we, as a company, had taken on to date and was a baptism of fire so to speak. The timeframe was anticipated to be 3-4 months but it actually took 7 months due to a particularly cold and snowy whereby the team stayed on site (camping in the grounds!) during the warmer months.

The weather we had and the extreme low temperatures prevented work from progressing as we had hoped. With the backing of Marshalls we suspended laying in these conditions where frost could cause problems with the materials and the laying course (particularly where frozen materials can swell in the presence of frost and so their use can give incorrect levels and problems with compaction).

To give an overview of the project and size - there were over 600 steps engineered and cast in concrete in four separate pours, 2,400+ cuts made on the steps alone and 2,000 square metres of paving laid.

How did we approach the project?

As it was the largest project we have ever installed and managed, we thought it wise to partner with an engineering firm. We chose a local firm that we had a good relationship with and had worked with on previous projects.

Having our own team of engineers proved to be a key decision and we worked alongside Bath Rugby Clubs resident architect and engineering team and had numerous team consultations. These were to ensure the project was progressing as planned, to ensure all teams were working cohesively on the project and to ensure best practice when setting out levels.

Their own team of groundworkers completed the excavation works and we then laid the products, cut, jointed and finished the project.

How were the levels set out?

Setting out the levels was achieved using total stations, laser levels and good old string lines. The engineers set out the levels three days ahead of us, the laying team, for kerb heights which were then laid and then the roadways were excavated down from the finished heights on the kerbs.

How was accuracy maintained?

Accuracy on the project was maintained via regular checks by the engineering team to ensure all works were within a 3mm tolerance. We worked to the clients’ drawings throughout and for more precise cuts on the paving used a wet cut bench saw (which gives a better finish).

The client chose to use all Marshalls products and so had their help and advice with any technical queries or product issues that arose.

Overall, the project was a learning curve for us as a small company but gave us the experience of working on a £250k+ contract, working with a high profile client and working on a prestigious project (and it’s great for the portfolio). Our ‘takeaways’ from the experience are; to have a good engineer beside you to enable a complete overview of a project of this scale and to see any problems before they arise. Secondly, know your numbers, if we had not worked day and night number crunching before submitting our quotation we could have put the company at risk. Finally, be prepared for delays out of your control (due to the great British weather) and be prepared to suspend works if necessary.

Thankfully we did pull the project off …

“Mike worked seamlessly with our architect to bring the design to life. He was able to fine tune the architectural design to ensure it worked well with the product, as the finish had to be both aesthetically pleasing and practical. After all, the players are incredibly important to us, and from a practical and safety perspective, it had to be spot on.” Lee Callow, Facilities Manager, Farleigh House

For more information on Aura landscapes, visit their website: www.auralandscapes.co.uk 

Votes: 0
E-mail me when people leave their comments –

You need to be a member of Landscape Juice Network to add comments!

Join Landscape Juice Network

Open forum activity

Mjc replied to Gary Etherington's discussion Start up business machines?
"I just bought a new 476 hy as a local dealer had them at £954 inc. Used it on two lawns today, one had quite thick grass. Seems to be very good. Excellent mulching, nice to operate, (well balanced and not too heavy) with a good range of drive…"
7 hours ago
Billybop replied to Richard's discussion Battery strimmer/blower/kombi?
"nice one yes I find the virtual complete lack of maintenance required on the battery kit very convenient, hedge trimmers need a bit of sharpening resin removal and greasing, mowers just a blade sharpen or change, strimmers just require strimmer line…"
9 hours ago
Acacia Groundcare Hire updated their profile
12 hours ago
My Garden Design posted a blog post
Every landscaping project should have a good, well thought out garden design from the outset. It forms the basis of quote, your workflow documents, your health and safety strategy and most of your customer communications. But what if creating layout…
15 hours ago
Calcutta D is now a member of Landscape Juice Network
20 hours ago
Richard replied to Richard's discussion Battery strimmer/blower/kombi?
"I'd love to go all battery in the future, and like you say batteries are very expensive. I think I'm going to go with stilh 545 petrol mower and I'm looking at echo and ego stuff. Thanks again."
yesterday
Robbie posted a blog post
yesterday
Billybop replied to Richard's discussion Battery strimmer/blower/kombi?
"I use only battery mowers these days also (a big investment in batteries there), been giving horrible wet lawns full of moss first cuts this week, mostly with my Stihl battery mower as they have good wet pick up compared to a lot of cordless…"
yesterday
Richard replied to Richard's discussion Battery strimmer/blower/kombi?
"Thanks for the comment billypop I've been interested in the battery side of things for a while, and battery led tools are so much better than y they used to be.  I'm also looking for a 4 wheeled mower but definitely need petrol for that for my…"
yesterday
Billybop replied to Richard's discussion Battery strimmer/blower/kombi?
"Hi I pretty much only use battery kit, have never owned any type of Kombi system personally as I prefer the stand alone tools. Mostly use a Stihl FSA85 battery strimmer for the neat type of regular lawn edges etc. (I have bigger more powerful ones…"
yesterday
Richard posted a discussion
Hi all Im looking for some recommendations please. Looking to buy a strimmer and a blower, I'm really liking the idea of going battery powered. I run a very small grass cutting buisness and I don't know weather just to go and get a kombi system? Any…
yesterday
Peter sellers replied to Gary Etherington's discussion Start up business machines?
"The 536 has so called smart drive forward speed controls on the handle bars, nothing smart about them, difficult to maintain a constant speed especially on bumpy lawns. You may get on ok with them, we couldn"t. I would try one out before committing,…"
yesterday
Gary Etherington replied to Gary Etherington's discussion Start up business machines?
"Thanks for the replies chaps,
the kit I'm swinging toward is
hrn 536 vy (800-900 quid)
stihl km94 rc e (350 quid)
strimmer and blower attachments (170 each)
 
leaves roughly 4-500 quid of the machinery budget to play with.
as for my farm and…"
yesterday
James King replied to James King's discussion John Deere Z530 Vs Z545 - HELP?
"Thanks, Vic. I know you're a big fan of the John Deere. Based on your previous advice, that's why I was looking at the 530 with the option of mulching. As I said, I was all set up for this until I saw the 545. From the engineering perspective, the…"
yesterday
Mjc replied to Gary Etherington's discussion Start up business machines?
"If I could only have one mower it would be a honda izy. Good value and bomb proof engines. The Toro recycler mowers are good for the price but in my experience pretty poor in damp/ wet conditions. Could be worth asking your local dealer if they've…"
yesterday
Vic 575 replied to James King's discussion John Deere Z530 Vs Z545 - HELP?
"I have a John Deere 535m. I have owned it for six years. I have the mulch kit fitted. I did though use it for the first season without the mulching kit, as side discharge only.
The difference in the finished appearance between mulching and side…"
Saturday
More…

Battery strimmer/blower/kombi?

Hi all Im looking for some recommendations please. Looking to buy a strimmer and a blower, I'm really liking the idea of going battery powered. I run a very small grass cutting buisness and I don't know weather just to go and get a kombi system? Any…

Read more…
5 Replies · Reply by Billybop 9 hours ago
Views: 118