Setting out a large landscaping project

How did a small landscaping contractor from Southampton secure a huge contract (their largest contract to date) out of area and manage it you ask? Let’s start at the beginning…

Bath Rugby Club wanted some landscaping works completed at their training ground, Farleigh House. They approached Marshalls, as the leading product manufacturer in the UK who put forward three of their best award winning domestic contractors who were a part of their register.

The brief was to create a large car parking area, lay paths and create a paved awards atrium with steps (lots of them) for the rugby clubs training facilities situated at Farleigh House.

The products they chose to complete the project was Marshalls Antique Silver Sawn Sandstone plus step kits, Scoutmoor Setts for the paved areas and Tegula Drivesett Traditional kerbs.

It was imperative that the project met the highest standards of workmanship with a fantastic finish as the training facilities are accessed by the media to film live coverage and reports so it was the first impression given to fans and followers of Bath Rugby Club (no pressure!!)

The client’s main concern was attention to detail so although the contract was technically a commercial project they requested a high quality domestic installer and hence the project was secured.

The project was the largest we, as a company, had taken on to date and was a baptism of fire so to speak. The timeframe was anticipated to be 3-4 months but it actually took 7 months due to a particularly cold and snowy whereby the team stayed on site (camping in the grounds!) during the warmer months.

The weather we had and the extreme low temperatures prevented work from progressing as we had hoped. With the backing of Marshalls we suspended laying in these conditions where frost could cause problems with the materials and the laying course (particularly where frozen materials can swell in the presence of frost and so their use can give incorrect levels and problems with compaction).

To give an overview of the project and size - there were over 600 steps engineered and cast in concrete in four separate pours, 2,400+ cuts made on the steps alone and 2,000 square metres of paving laid.

How did we approach the project?

As it was the largest project we have ever installed and managed, we thought it wise to partner with an engineering firm. We chose a local firm that we had a good relationship with and had worked with on previous projects.

Having our own team of engineers proved to be a key decision and we worked alongside Bath Rugby Clubs resident architect and engineering team and had numerous team consultations. These were to ensure the project was progressing as planned, to ensure all teams were working cohesively on the project and to ensure best practice when setting out levels.

Their own team of groundworkers completed the excavation works and we then laid the products, cut, jointed and finished the project.

How were the levels set out?

Setting out the levels was achieved using total stations, laser levels and good old string lines. The engineers set out the levels three days ahead of us, the laying team, for kerb heights which were then laid and then the roadways were excavated down from the finished heights on the kerbs.

How was accuracy maintained?

Accuracy on the project was maintained via regular checks by the engineering team to ensure all works were within a 3mm tolerance. We worked to the clients’ drawings throughout and for more precise cuts on the paving used a wet cut bench saw (which gives a better finish).

The client chose to use all Marshalls products and so had their help and advice with any technical queries or product issues that arose.

Overall, the project was a learning curve for us as a small company but gave us the experience of working on a £250k+ contract, working with a high profile client and working on a prestigious project (and it’s great for the portfolio). Our ‘takeaways’ from the experience are; to have a good engineer beside you to enable a complete overview of a project of this scale and to see any problems before they arise. Secondly, know your numbers, if we had not worked day and night number crunching before submitting our quotation we could have put the company at risk. Finally, be prepared for delays out of your control (due to the great British weather) and be prepared to suspend works if necessary.

Thankfully we did pull the project off …

“Mike worked seamlessly with our architect to bring the design to life. He was able to fine tune the architectural design to ensure it worked well with the product, as the finish had to be both aesthetically pleasing and practical. After all, the players are incredibly important to us, and from a practical and safety perspective, it had to be spot on.” Lee Callow, Facilities Manager, Farleigh House

For more information on Aura landscapes, visit their website: www.auralandscapes.co.uk 

Votes: 0
E-mail me when people leave their comments –

You need to be a member of Landscape Juice Network to add comments!

Join Landscape Juice Network

Open forum activity

Paul Errington replied to Mitchel ingham's discussion Winter and spring ideas for work
"One of our landscape machinery customers used to organize labour for snow clearance operations at Heathrow Airport. Those who signed up were paid to do training days, and received a very generous hourly rate if they attended a snow event. Problem…"
4 hours ago
Billybop replied to Tim Bucknall's discussion Stihl blowers failing
"Hi yes I still have my 6500 Ego too, kept in case the newer one ever failed, but it hasn't. Had the 5 hundred-something cfm one before that, now flogged to a mate who loves it. The LB8800 is hovering around the £300 mark on amazon including import…"
yesterday
Sam Bainbridge replied to Tim Bucknall's discussion Stihl blowers failing
"Just change to a backpack, br800 7yrs and not even a sparkplug yet"
Saturday
Clive replied to Tim Bucknall's discussion Stihl blowers failing
"Stop using BG86s absolutely years ago first ego blower I had which is now my spare is the 6500 now have the 7650 which is brilliant. 
for large areas I have a back pack Stihl BR800 this combo does me "
Saturday
Adam Woods replied to Tim Bucknall's discussion Stihl blowers failing
"I use a BGA50 - with 3 batteries rotating... each lasts around an hour - there is an AP version which probably has much better batteries. Then for heavy duty work a BR500. We bought that last year, and at the time looked at the BRA500 - but  with…"
Saturday
John F replied to Tim Bucknall's discussion Stihl blowers failing
"When you say lately Tim have you considered fuel contamination ? 
Generally have always used the Stihl kombi with the ( blower attachment ) as a dedicated blower .
It does play up so i take it to my repair guy who always manages to keep it going on…"
Saturday
Honey Badger replied to Tim Bucknall's discussion Stihl blowers failing
"I've watched a few videos on the 9010 serious power knocks the socks of the br850.  I'm not a fan of 4mix engines.
20yrs with a blower that's Impressive.
I haven't managed to find a local dealer for echo I'd prefer to have a look first than buy…"
Friday
Peter sellers replied to Tim Bucknall's discussion Stihl blowers failing
"We have run pb 8010's for four years without issue and also pb770"s for everyday use. The pb 9010 is 10% more powerful than the 8010 which in itself is an awesome blower and outperforms anything Stihl have. We are nearly all Echo kit now and have…"
Friday
Honey Badger replied to Tim Bucknall's discussion Stihl blowers failing
"I use the husqvarna 525bx. I used to use bg86's (had 3), carbs were good for 3-4 years before failure. You can get cheap Chinese carbs. 525bx is a better machine, it doesn't turn in the hand because of the nozzle and is more powerful, I think its…"
Thursday
Billybop replied to Tim Bucknall's discussion Stihl blowers failing
"Ego 7650 battery model has excellent power had it a few years now and has never missed a beat, I use the 7.5ah batteries with it, they have recently brought out a couple slightly more powerful but those have a fancy LED screen which would get…"
Thursday
Peter sellers replied to Tim Bucknall's discussion Stihl blowers failing
"Echo are bombproof !!"
Thursday
Tim Bucknall posted a discussion
I've had a definite increase in machinery failing, and lately I've had a rash of BG86 blowers failing due to carburettor wear- something I've never come across before.  Has anyone else had issues like this?  What hand-held blowers would people…
Thursday
Sam Bainbridge replied to Peter sellers's discussion Making tax digital
"Let's face it this first year they will stamp there feet if you don't comply but won't do anything, next year will be the year"
Wednesday
Sam Wharton updated their profile photo
Tuesday
Ian Harvey replied to Peter sellers's discussion Making tax digital
"I suggest that everybody on here read the HMRC MTD Guidance notes.
HMRC base the requirement for MTD ITSA on prior year tax return figures, including any now-ceased income streams. No crystal balls involved."
Dec 9
Peter sellers replied to Peter sellers's discussion Making tax digital
"Good point about having a crystal ball re turnover. Like you say what can they do about it!"
Dec 8
More…

Making tax digital

Thought there might be some unaware of this. So briefly and I am not an accountant . As from 6th April 26 anyone who has income from self employment, rent from property etc or a combination that equates to a turnover of 50k or more (not profit) will…

Read more…
26 Replies · Reply by Sam Bainbridge on Wednesday
Views: 852