Setting out a large landscaping project

How did a small landscaping contractor from Southampton secure a huge contract (their largest contract to date) out of area and manage it you ask? Let’s start at the beginning…

Bath Rugby Club wanted some landscaping works completed at their training ground, Farleigh House. They approached Marshalls, as the leading product manufacturer in the UK who put forward three of their best award winning domestic contractors who were a part of their register.

The brief was to create a large car parking area, lay paths and create a paved awards atrium with steps (lots of them) for the rugby clubs training facilities situated at Farleigh House.

The products they chose to complete the project was Marshalls Antique Silver Sawn Sandstone plus step kits, Scoutmoor Setts for the paved areas and Tegula Drivesett Traditional kerbs.

It was imperative that the project met the highest standards of workmanship with a fantastic finish as the training facilities are accessed by the media to film live coverage and reports so it was the first impression given to fans and followers of Bath Rugby Club (no pressure!!)

The client’s main concern was attention to detail so although the contract was technically a commercial project they requested a high quality domestic installer and hence the project was secured.

The project was the largest we, as a company, had taken on to date and was a baptism of fire so to speak. The timeframe was anticipated to be 3-4 months but it actually took 7 months due to a particularly cold and snowy whereby the team stayed on site (camping in the grounds!) during the warmer months.

The weather we had and the extreme low temperatures prevented work from progressing as we had hoped. With the backing of Marshalls we suspended laying in these conditions where frost could cause problems with the materials and the laying course (particularly where frozen materials can swell in the presence of frost and so their use can give incorrect levels and problems with compaction).

To give an overview of the project and size - there were over 600 steps engineered and cast in concrete in four separate pours, 2,400+ cuts made on the steps alone and 2,000 square metres of paving laid.

How did we approach the project?

As it was the largest project we have ever installed and managed, we thought it wise to partner with an engineering firm. We chose a local firm that we had a good relationship with and had worked with on previous projects.

Having our own team of engineers proved to be a key decision and we worked alongside Bath Rugby Clubs resident architect and engineering team and had numerous team consultations. These were to ensure the project was progressing as planned, to ensure all teams were working cohesively on the project and to ensure best practice when setting out levels.

Their own team of groundworkers completed the excavation works and we then laid the products, cut, jointed and finished the project.

How were the levels set out?

Setting out the levels was achieved using total stations, laser levels and good old string lines. The engineers set out the levels three days ahead of us, the laying team, for kerb heights which were then laid and then the roadways were excavated down from the finished heights on the kerbs.

How was accuracy maintained?

Accuracy on the project was maintained via regular checks by the engineering team to ensure all works were within a 3mm tolerance. We worked to the clients’ drawings throughout and for more precise cuts on the paving used a wet cut bench saw (which gives a better finish).

The client chose to use all Marshalls products and so had their help and advice with any technical queries or product issues that arose.

Overall, the project was a learning curve for us as a small company but gave us the experience of working on a £250k+ contract, working with a high profile client and working on a prestigious project (and it’s great for the portfolio). Our ‘takeaways’ from the experience are; to have a good engineer beside you to enable a complete overview of a project of this scale and to see any problems before they arise. Secondly, know your numbers, if we had not worked day and night number crunching before submitting our quotation we could have put the company at risk. Finally, be prepared for delays out of your control (due to the great British weather) and be prepared to suspend works if necessary.

Thankfully we did pull the project off …

“Mike worked seamlessly with our architect to bring the design to life. He was able to fine tune the architectural design to ensure it worked well with the product, as the finish had to be both aesthetically pleasing and practical. After all, the players are incredibly important to us, and from a practical and safety perspective, it had to be spot on.” Lee Callow, Facilities Manager, Farleigh House

For more information on Aura landscapes, visit their website: www.auralandscapes.co.uk 

Votes: 0
E-mail me when people leave their comments –

You need to be a member of Landscape Juice Network to add comments!

Join Landscape Juice Network

Open forum activity

Graham Taylor replied to Peter sellers's discussion New for old insurance
"Sadly, I'd say  most commercially used stuff isn't really worth anything after 4 years work. As you say, if they give you half the new value, you'll never find a satisfactory secondhand one for that money but will just have to put it towards the…"
22 hours ago
Peter sellers replied to Julian chambers's discussion Sick pay insurance
"We used to use Cirencester Friendly Society, the friendly societies tend to offer better terms. Premiums are based on financial benefit amd how many days delay after injury/sickness you choose before they payout. Make sure all medical history…"
yesterday
Julian chambers posted a discussion
Hi all. Hope everyone is getting off to a good start this season.Can anyone recommend a decent sick cover or work injury company. There's a lot out there so solid suggestions welcome pleaee 
yesterday
Richard Shelton replied to PGM's discussion Grass Cutting 2026 Season
"Most of our contracts run from 1st April, but the grass is ready to cut now. I've cut my personal lawns, but like other commenters on here, I cut in late November as well. Too wet from December and brought February though."
yesterday
Neil Darby replied to PGM's discussion Grass Cutting 2026 Season
"Done a few first cuts this week, my own lawn (or whart is left of it, last Sat.) Far too wet, even for the Stihl battery mower on one of the four lawns, for one client. Firm enough everywhere else. But the Moss....... everywhere I look there is…"
Saturday
PGM replied to PGM's discussion Grass Cutting 2026 Season
"Absolutely, we're the same for wet weather. Get the right tools and good waterproofs and just carry on. Have a great season "
Saturday
M Olsson replied to M Olsson's discussion Trailer and Rotavator for Sale
"If allowed, happy to share private email or phone number "
Saturday
M Olsson posted a discussion
Hi everyone,Firstly, my sincerest apologies if this is not allowed. I set up my self employed gardening business a couple of years ago, went really well but unfortunately developed Rhabdomylosis, and turns out I have a rare genetic condition. Now I…
Saturday
Dylan replied to PGM's discussion Grass Cutting 2026 Season
"Very true great machines but heavy and c. Easy damage lawns if the ground is on the soft side"
Saturday
Sam Bainbridge replied to PGM's discussion Grass Cutting 2026 Season
"Gonna make a start this week had a day off on Thursday check all is running and ready for action even the 30yr old honda started 2nd pull they don't make them like that anymore, picked the iseki up too so all set to go next week although forecast…"
Saturday
Peter sellers replied to Ian Stanton's discussion lawn repair soil
"Ian, we have bought some utter crap over the last 40 years in the trade. The words " screened" and to " British Standard" are meaningless and appear to cover up screened demolition waste mixed with green waste or just green waste.
For the amount you…"
Saturday
David Benson replied to Peter sellers's discussion New for old insurance
"I forgot to add your premiums will go up as you have had a claim "
Friday
David Benson replied to Peter sellers's discussion New for old insurance
"Peter, thats how it works with them and its on your purchace price not the current RRP and will want purchace receipt. as a exsample a £600 machine in 4 years time will be valued at £190 but the new price could have gon up £100 in the 4 years since…"
Friday
John F replied to Ian Stanton's discussion lawn repair soil
"I tend to buy whatever top soil the local nursery has on offer usually in 25 litre bags , screened where possible and check it's not damp .
Store it in a dry place before use .
Have had the bulk bags where it's more viable to purchase in bulk but…"
Friday
Marc Piechocki posted a discussion
Friday
Ian Stanton posted a discussion
Hello, I have a approx 110 square meter shady lawn that I need to repair.  It was turfed two years ago, I think fairly badly, and doesn't seem to have been watered through the summer.It is patchy with 70% green, 30% dead.The client is only renting,…
Friday
More…

Trailer and Rotavator for Sale

Hi everyone,Firstly, my sincerest apologies if this is not allowed. I set up my self employed gardening business a couple of years ago, went really well but unfortunately developed Rhabdomylosis, and turns out I have a rare genetic condition. Now I…

Read more…
1 Reply · Reply by M Olsson on Saturday
Views: 71

lawn repair soil

Hello, I have a approx 110 square meter shady lawn that I need to repair.  It was turfed two years ago, I think fairly badly, and doesn't seem to have been watered through the summer.It is patchy with 70% green, 30% dead.The client is only renting,…

Read more…
2 Replies · Reply by Peter sellers on Saturday
Views: 145