THIS PROJECT IS UNDER CONSTRUCTION, CLICK HERE TO VIEW DAYS 6 - 10 IMAGES.

 

 Day 11

Gazebo and tools moved from sub base area so the intricate paving detail can be sprayed on the ground, all measurements and diameters are noted and loaded into CAD software, Sketchup Pro 8.

I undertake this marking out procedure because of the complexity of the paving design and to be precise when purchasing the materials.....

 

Work continues to lay the internal planter walling, the quoins are built first at each corner and the top block leveled with a laser level ensuring the correct finished height, a string line and wooden dolly's, and a tight knot free string line are then used to lay each course of block work.

 

 

Works also continue to mitre and nail the pvc render angle beads.

 

Day 12

 

All block work is completed, all angle render bead work is nearing completion, the dpm liner to the internal planter is hug and taped to stop the damp topsoil popping the render off at a later date.

Unlike the rest of the UK, we have not seen the frost so all mortar works continue. Once the ambient temperature falls to 3 degrees and dropping, as water in the mortar freezes, disruptive expansion of the mortar occurs. Finally, wet or ice-covered unit surfaces prevent development of a good bond between the mortar and unit.

I will not use any cement works period, it must be 3 degrees and rising for Jackson's Landscape Design to continue. No exceptions for any client will be made

 

The scratch coat is completed.

10 tons of the famous Torbay red topsoil is delivered to the front driveway and loaded to barrows and installed within the internal planter.

All scratch coat is covered as the forcasted rain will wash the lot off.

Off to pack and catch up with the best driveway installer in the UK, Mick Gammage, Cyrstalclear, Bolton a high profile Marshalls installer.

Day 13

For top coat the mixing process has no Febmix mortar plasticiser this is replaced with one  measurement of waterproofer, for all salty coastal areas two measurements are included.

The top coat, final render is applied with a hawk and steel trowel, the secret is get the mix on the walls and don't play around with it.....cement waits for no man....

Knowing that the South West of England is due for heavy rain tomorrow, 19/12/12, I must apply the render and float off with a plastic float and sponge finish today, as render and rain do not mix....I cant return early to finish off. 

A two coffee mugs full of rapid hardener to the 4;1 ratio render mix, this ensures that what ever I lay on is completed the same day......no returning in the rain.

The plastic float removes any small lumps and bumps, trowel lines and brings the course sand to the surface.

The sponge finishes the render to the finished requirements. The beads are kept clean ready for the paint application once the render has dried.

Day 14

Happy New Year one and all.

Right, back to work then, here's to a prosperous 2013.

The main existing armoured cable has the junction box removed and the cable is fed through the planter via a central hole. A trench is cut to house the ducting to up light the cupressus sempervirens to the perimeter planter of the garden.

Ducting is installed and back-filled with an electrical hazard warning tape above the duct.

A new tool has been erected as the "new" pop up gazebo wasn't worth a toffee, I wouldn't recommend the flimsy rubbish to any one. The graphite masonry paint sample has been applied to the finished render and approved by clients.

Works continue with the final render coat.

THIS PROJECT IS UNDER CONSTRUCTION, CLICK HERE TO VIEW FURTHER DAILY PROGRESS.

Votes: 0
E-mail me when people leave their comments –

Comments

  • PRO

    looking good Kerry, its transformed the rear garden

  • Thanks Mick....it''l look totally different from when I first arrived.

  • Only one word to describe this work, 'Excellent' The photography is amazing and compliments the work. Congratulations Kerry, well done. Eric Barker.

  • Kerry, Any chance of finishing the series? The garden looks fantastic as per usual!

  • Of course Mr Ray.....Once I return, tomorrow 07/01/13, the daily blog will continue....

This reply was deleted.

You need to be a member of Landscape Juice Network to add comments!

Join Landscape Juice Network

Open forum activity

Martin Ashdown posted a discussion
I am well out of my comfort zone and was hoping for some feedback.I have spent the last 22 years running a lawn care business LawnsOne and recently with a friend in the industry we have started a podcast talking about our REAL journey to a…
15 hours ago
Fusion Media posted a blog post
MM Seed enters 2026 with a refined and strengthened range, building on its reputation for quality, performance and reliability across golf, winter sports, cricket and tennis.With carefully selected cultivar updates and the continued inclusion of…
15 hours ago
Billybop replied to Mark Wilkinson's discussion Hayter Harrier 56 Pro 60V
"Petrol lawmowers befouling the air at Windsor castle, disgraceful, maybe heads will roll when the King finds out"
17 hours ago
Nick @ NM Garden Services Ltd replied to Julian chambers's discussion Van security
"Have a look at the VATTA forum on facebook. In betyween the tales of woe there is some very useful advice."
21 hours ago
Mark Wilkinson posted a discussion
Only just noticed this forum is based just down the road from one of my favorite parts in the whole wide world.  Only been a member for the last six years and only login about five times a year but thanks for the great work, merci beaucoup!
21 hours ago
Mark Wilkinson replied to Mark Wilkinson's discussion Hayter Harrier 56 Pro 60V
"It's a shame they never asked Hayter to borrow the prototype Pro 60v to promote renewables really. Great plug for Hayter though, I was at Windsor Castle the other day and the groundsmen were using petrol Honda mowers 🙄"
21 hours ago
Mark Wilkinson replied to Julian chambers's discussion Van security
"🤣👍"
21 hours ago
Mark Wilkinson replied to Julian chambers's discussion Van security
"Great ideas!
Although signwriting our vans is a double headed sward — we can get £1000s from new clients a year and sadly we're a target by a few going about our business, but doubling up on security reduces the risk by nearly 50% going off last…"
21 hours ago
Mark Wilkinson replied to Julian chambers's discussion Van security
"Totally agree!
 
James: "Until the government and police start treating this crime seriously and handing out long jail sentences and cracking down on the thieves and the people handling stolen goods it will only get worse.
I'm sure all of you on…"
21 hours ago
Henry Voice replied to Richard thewles's discussion Cancelling subscription.
"Hi Richard,
send me over an email at henry@landscapejuice.com and we'll go from there.
 
thanks 
Henry "
yesterday
Joanne Evans updated their profile photo
yesterday
Joanne Evans updated their profile
yesterday
PGM replied to Richard thewles's discussion Cancelling subscription.
"There are contact details at the bottom of the page, i'd suggest trying them. Enjoy retirement!"
Monday
Anthony Toop replied to Julian chambers's discussion Van security
"Vanolarm are pretty good, goes off when door handles are pulled or sudden vibration, not overly loud with doors closed, but inside it's very uncomfortable on the ears! Economical on the batteries too.
Cable everything together and to the van
Hook…"
Monday
Richard thewles posted a discussion
Hi all, wrapped in business years ago but realised im still paying subscription, could somebody tell me how to cancel ? Thanks.richard.
Monday
Sam Bainbridge replied to Julian chambers's discussion Van security
"I just have a very big angry rottweiler that spends his nights in the van. No issues so far 😁"
Sunday
More…

Baynac-et-Cazenac 

Only just noticed this forum is based just down the road from one of my favorite parts in the whole wide world.  Only been a member for the last six years and only login about five times a year but thanks for the great work, merci beaucoup!

Read more…
0 Replies
Views: 11