How to build a sleeper retaining wall

Sleeper retaining walls have been topical of late but for all the wrong reasons.

When used effectively i.e. in the right place for the right application, old railways sleepers can be a strong ornamental feature for creating vegetable beds or formal plants and shrub borders or even, perhaps, as the boundaries to lawns or to create terraces to make use of a sloped and otherwise unusable piece of ground.

Jane asked this question in the 'Cowboys from the wild west' thread but I feel it's appropriate that the question is asked independently of that thread as I'm sure there could be some real positive knowledge and experiences shared.

Jane said: "I need to design a retaining wall to level up a kitchen garden. This would be about 900mm high and 24m long. Is this possible with sleepers laid on their back? How often should the reinforcement tying sleepers go in? Is this the most cost effective way of retaining this or could it be done more cheaply? The wall is not going to be visible from anywhere."

You need to be a member of Landscape Juice Network to add comments!

Join Landscape Juice Network

Email me when people reply –

Replies

  • PRO
    Here's a good site to see lots of images of railway sleeper retaining walls used in many different types of applications:

    http://www.railwaysleeper.com/Customers%20ideas,%20photos%20and%20p...
  • PRO
    Good use of sleepers in this Mediterranean garden:
    http://www.railwaysleeper.com/Howard%20&%20Tracey%20Walsh%27s%2...
  • I have made sleeper pins in the past for different landscapers, some use 16 or 20mm round bar with a point forged on one end and a washer welded on the other end some have been smaller diameter again with a forged point but with a short tee bar welded on the other end.
  • Railway sleepers, not for me.

    Another installation process for new green crisp edged sleepers are to install vertically, using the earths surface for retention as opposed to the standard horizontal process, when installing horizontally ensure that the same principal and block work is exercised, ie Staggered joints for maximum strength



    For all vertical sleeper works make sure that what ever length exposed must be the same length embedded in the ground with staifix and RC 35 concrete

    Vertical sleepers:

  • It seemed a bit mad when I started,
    few people asked for raised beds from this material, phil was willing to help ( remember phil- with asparagus raised beds)

    Well improved on colour, height and these days it works well in many kitchen gardens and allotments.
    even few big gardens installed that lately.

    David actually helped a lot toi show what can you do with recycled plastic.
    I know plastic sound like a big no no but once I saw what customers did with it -I was impressed!



    I think it worth using david services to show customers what can you do.

    Once again Landscape juice helped me a lot, must mention working with steve and tina- was great too.
  • Why the 'L' brackets? Why not just use timberlocks secured from the back or to gove it a bit of character coach bolts / screws from the front. Both ae stronger than 'L' brackets.

    thegardensurgery.com said:
    PART THREE
    (INSTALLATION OF SLEEPERS)
    By the morning your posts would of set solid, So place your sleeper on its side against the front of the post, ensure its a snug fit, at each end make sure the adjoining sleeper fits flush, plane the edge if needed.
    One your sleepers are in place use a CORNER BRACEor L BRACKET (3" or 4") fix the sleeper to the post, the bracket should sit on the top half on the sleeper and half on the post. on the first row there should be one on the centre post and one on the edge of the end posts. screw the brackets on using decent quality screws (4") galvanised if possible.
    Fix another couple of brackets behind the wall towards the bottom, this will ensure the bottom does not kick out under pressure.
    fix the sleepers together with galvanised 4" nails on each edge of the sleep on a angle into the next sleeper this should be done top and bottom


    To install the next layer of sleepers you will need to do a sleeper cut, this is around 4.3 feet and this will connect from the first post to the middle post, this will then create a bond in the wall and the posts should all meet like the first row installed first.
    As this is the finishing level you will need to fix 2 brackets to the rear of this sleeper so they cannot be seen, add plenty of nails, avoid splitting the sleeper.
    You now have a finished sleeper wall of 20" ....to make it 30" just make the posts bigger, and repeat the process.

  • PRO
    Isn't it about the access from the rear to punch a timberlok thru the post into the sleeper. I've had the same problem. Putting them thru the front - personal/client taste ?
  • RSJ's with sleepers slotted between could be an option especially as it is not seen so the aesthetics of coursing is not an issue (I do appreciate that coursing adds strength but an RSJ will be a lot stronger than a 4” by 4” post!
    I have just priced up a job whereby we are using our normal procedure which is very similar to that documented by the Garden Surgery. However it is too expensive for the client so I am tinkering with substituting some of the 4” by 4” posts that we would normally concrete into the ground with angle irons which we would dive in with a sledge hammer and then drill holes in and screw to the back of the sleeper.
  • Have a friend who's a geotechnical engineer. He always bangs on about the fact that a retaining structure needs mass, so for example those massive nets full of rocks stacked; sleepers on end as JLD says, the 1/2 in the ground means that the amount of force exerted on the upstand can never (in normal use!) overcome the mass against the buried half.

    Charles - If your talking about strength and longevity I like how Steve Snedecker(? Member on here, U.S.) said that he did sleeper retaining walls.
    Laid flat pinned together with 20mm steel bars with a 4'header every 8' or so into the retained earth. This header in turn has a 4' long section of sleeper bolted to it.
    The strength done this way would be colossal. The whole point is that this retaining structure is being held by the weight/mass of the retained earth - Very clever :)
    This is how I will construct in future. The fixings used should outlast the sleepers....

    Must admit I don't like the look/sound of the angle plates, or screws! When they're rusted away the posts will do jack!
  • Sounds similiar to how some concrete slabs are laid basically you have an 'L' shape meaning that for the wall to fall it has got to be able to lift all the soil behind it as well which is highley unlikely.



    Andy Thorne said:
    Have a friend who's a geotechnical engineer. He always bangs on about the fact that a retaining structure needs mass, so for example those massive nets full of rocks stacked; sleepers on end as JLD says, the 1/2 in the ground means that the amount of force exerted on the upstand can never (in normal use!) overcome the mass against the buried half.

    Charles - If your talking about strength and longevity I like how Steve Snedecker(? Member on here, U.S.) said that he did sleeper retaining walls.
    Laid flat pinned together with 20mm steel bars with a 4'header every 8' or so into the retained earth. This header in turn has a 4' long section of sleeper bolted to it.
    The strength done this way would be colossal. The whole point is that this retaining structure is being held by the weight/mass of the retained earth - Very clever :)
    This is how I will construct in future. The fixings used should outlast the sleepers....

    Must admit I don't like the look/sound of the angle plates, or screws! When they're rusted away the posts will do jack!
This reply was deleted.

Industry Jobs

Plant Health Supervisor

Plant Health Supervisor required for family run wholesale shrub & perennial nursery. Candidates must hold a full clean driving licence as you will be required to travel between sites. It is essential that you hold the correct industry standard qualifications for the post. The right candidate will be required to spray all stock on a

Landscape contractor

Landscape contractor required for Landscaping company based in Surrey. Candidate should have minimum five years experience and be  proficient in laying Paving, Brickwork, fencing, operating an excavator and general Landscaping tasks. A clean driving licence also required.

Experienced gardener

Grove Gardens is an established landscape gardening business in Brighton and Hove and we are currently looking for an experienced gardener to join our team. You must be a highly motivated individual with a professional attitude to your work. Experienced in garden maintenance and a good plant knowledge. A full driving licence is essential. Competitive

Landscape and grounds maintenance operative

Landscape and grounds maintenance operative required for a well established landscaping company based in south wales. Looking for an enthusiastic and well motivated worker who works well as part of a team or on their own.  Must have at least 3 years experience in landscaping/ grounds maintenance and sports ground maintenance and renovation. The roles

Business Objectives Group (BOG)

PRO

GDPR

Morning all,Not a riveting start to the 'spring' season. Trying to chalk this one off before my business reaches top speed. I'm just trying to build my understanding on GDPR so the time that I put into in is for sure the right work.I plan on…

Read more…
13 Replies · Reply by Geoffrey King 9 hours ago
PRO

Webb Lawnmowers, opinions?

Hi everyone, I have a small business, just me, and do mainly garden maintainence and weeding/planting along with other jobs such as jetwashing and so on as I have a number of elderly customers who always ask for very small "other" jobs. I cut lawns,…

Read more…
1 Reply · Reply by Adam Woods 13 hours ago
PRO

Running costs

I know we all have differnt costs, income, circumstances, situations etc, but I'm interested to see what you would expect the daily running costs would be for a one man band with two subcontractors?I'm talking one team of three people with one…

Read more…
10 Replies · Reply by John Powley 23 hours ago

Latest blog post

PRO Supplier

Sherriff Amenity is delighted to announce that it is now the exclusive UK distributor of Carbon Gold’s Enriched Biochar Turf Improver.

Carbon Gold’s aim is to increase soil fertility and improve turf health through the use of…

Read more…

Trade green waste centres

If you've received help from the Landscape Juice Network and you'd like to say thank you, why not make a small donation?

The site is maintained as an indpendent industry resource and it's become an essential tool for those working in the landscape industry.

Thank you

Phil Voice

Founder Landscape Juice

Make a donation

LJN Sponsor

Advertising

Blogs

PRO Supplier

Sherriff Amenity is delighted to announce that it is now the exclusive UK distributor of Carbon Gold’s Enriched Biochar Turf Improver.

Carbon Gold’s aim is to increase soil fertility and improve turf health through the use of…

Read more…